PoC sign-off checklist
Practical items to work through across 7 steps, to move a PoC forward to internal approval.
Available in Japanese only: this checklist is currently published in Japanese only. The overview below is in English, but the full 37-item checklist has not yet been translated.
This checklist organizes, in 7 steps, the practical items to prepare before proposing a PoC (proof of concept) for a large enterprise or new venture, so it can win internal sign-off. It runs from clarifying the purpose, through narrowing the hypothesis, confirming integration with existing systems, staged budgeting, go/no-go criteria, steering, and team structure.
It avoids language tied to a specific technology or product, and organizes points generally worth knowing from the perspective of someone drafting an internal proposal. It does not guarantee an outcome — use it as a starting point for internal discussion.
How this resource is organized
- Section 2: Step 1 — Clarifying the purpose and problem (5 items)
- Section 3: Step 2 — Setting 1–3 hypotheses to test (5 items)
- Section 4: Step 3 — Confirming the scope of integration with existing systems (6 items)
- Section 5: Step 4 — Staged budgeting and the sign-off flow (6 items)
- Section 6: Step 5 — Go/no-go and exit criteria (5 items)
- Section 7: Step 6 — Steering and progress-sharing (5 items)
- Section 8: Step 7 — Team structure (5 items)
Step 1: Clarifying the purpose and problem
Purpose: put into words, at a level a sign-off reader will understand, what the PoC is meant to establish. The first question a sign-off process asks is "why is a PoC needed?" Before explaining the technology, aim to be able to state the business problem and the question the PoC should answer in 1–2 sentences.
- The business problem to solve can be explained in 1–2 sentences
- The question the PoC is meant to answer (whether to move to production) is clear
- You can explain why now is the right time to verify this
- The impact or opportunity cost of not running the PoC is organized
- Related existing businesses and departments have been identified
Step 2: Setting 1–3 hypotheses to test
Purpose: narrow the hypotheses and set a PoC scope that can be explained in a sign-off request. Too many hypotheses inflate the verification period and cost, and make sign-off harder to obtain. Narrowing to hypotheses that connect directly to a production decision — 1 to 3 of them — makes the scope and cost easier to justify.
- The hypotheses being tested are narrowed to 1–3
- Each hypothesis has a defined "condition for saying it was verified" (an evaluation metric)
- The hypotheses connect directly to a production decision (hypotheses that would not inform a decision have been excluded)
- The hypotheses are prioritized
- The measurement method for each evaluation metric is decided
Step 3: Confirming the scope of integration with existing systems
Purpose: document, at the sign-off stage, the integration points that tend to cause rework at the production-migration stage. Confirming the integration scope and test method during the PoC stage reduces the risk of additional cost and schedule delay later.
- The scope of existing systems to integrate with during the PoC is identified
- The IT department has confirmed the API/data access needed for integration
- It has been confirmed whether integration can be verified in a test environment with dummy data
- The additional work expected for production integration is roughly understood
- How data (personal or confidential information) will be handled is organized
- The confirmation flow with the IT and security departments is understood
Step 4: Staged budgeting and the sign-off flow
Purpose: make it easier to get approval even before the total cost is settled. The dilemma of "sign-off won't happen until the full cost is fixed" can often be eased by splitting the request into concept, PoC, and production stages, each scoped so a decision can be made on its own.
- Cost ranges are organized across the three stages: concept, PoC, production
- The PoC-stage budget is broken into a unit that is easier to get approved
- Candidate budget categories (department budget, new-venture budget, subsidy, etc.) are identified
- The sign-off approval route (decision-maker, co-approvers) is understood
- Deliverables for each phase and the condition for moving to the next are organized
- The assumptions behind the estimate (scope, timeline, team) are documented
Step 5: Go/no-go and exit criteria
Purpose: decide the decision criteria before starting, so a decision to stop can also be made after the PoC. Setting go/no-go conditions before starting avoids getting stuck unable to decide to stop, and including exit criteria in the sign-off request makes it easier to present as a plan that limits downside.
- The condition for a "go" (move to production) decision is defined
- The condition for a "no-go" (revise or discontinue) decision is defined
- The timing of the decision (mid-point, at completion) is decided
- The learnings or reusable outputs to preserve in case of exit are organized
- The decision-making body and decision-maker are decided
Step 6: Steering and progress-sharing
Purpose: design a progress-sharing mechanism where senior management can make decisions and the field team can course-correct. Deciding the cadence and format for progress-sharing in advance, and separating weekly field-level updates from monthly senior-management decisions, keeps reporting load down while preserving clear decision points.
- The cadence for progress-sharing (weekly, monthly, etc.) is decided
- A steering forum for senior management/decision-makers is set up
- A reporting format (progress, issues, pending decisions) is ready
- An escalation path for unexpected events is decided
- The scope of sharing with related departments (business, IT, legal) is organized
Step 7: Team structure
Purpose: organize the internal team that will run the PoC, and the division of responsibility if using outside support. A PoC needs more than technical verification — cooperation across business, IT, and legal. Organizing internal roles, and the responsibility split with any external partner, at the sign-off stage helps avoid stalling once work begins.
- The PoC's lead department and owner are decided
- The business, IT, and legal points of contact are each identified
- The internal staffing (people, time) available is roughly understood
- The responsibility split with an external partner, if used, is organized
- The decision-maker (who holds final authority) is clear
How to use the scoring sheet
- Most items confirmed at each step
- Ready to proceed to sign-off — proceed, noting any unconfirmed items as a risk.
- Some steps still unorganized
- The main issues are covered — recommend organizing the remaining items before drafting the request.
- Multiple steps not yet started
- Recommend organizing purpose, structure, and budget category first.
Related resources
- Web3 PoC design template — a fill-in template for hypothesis, KPIs, scope, and exit criteria
- A PoC design guide for large enterprises and new ventures — points assuming integration with existing systems, sign-off flow, and staged budgeting
- PoC support service — staying with you through four phases from concept to production operation
Talk to Netsujo
If "I can't quite finish organizing the sign-off points" or "I want advice on integration with existing systems, or how to structure staged budgeting," a free 30-minute first consultation can help work through the issues together — from as early as the stage of organizing verification scope and decision criteria for an internal approval. Our standard scope of support includes:
- Putting the purpose and problem into words, and narrowing the hypothesis to test
- Confirming the scope of integration with existing systems, and mapping out the path to production
- Designing staged budgeting and go/no-go criteria
- Designing steering and progress-sharing